Project coordination within the modernisation of Budapest Airport:
The employees of SÖLLNER CONSULT GmbH take over the professional and strategic
coordination of the application documents for the approval procedures together
with the project investor. 2007-2008 |
 |
 |
 |
|
|
|
|
 |
 |
Project management for the extension of the Frankfurt-Hahn Airport:
The SÖLLNER CONSULT GmbH has performed coordination and control of the implementing
planning for the erection of a new passenger apron at the Frankfurt-Hahn Airport. 2006-2008 |
 |
 |
 |
|
|
|
|
 |
 |
Technical planning for the extensions of the Frankfurt-Hahn Airport:
The SÖLLNER CONSULT GmbH has realised the technical planning for the erection
of the new passenger apron at the airport of Frankfurt-Hahn on the level of
approval planning. 2006-2008 |
 |
 |
 |
|
|
|
|
 |
 |
Evaluation of existing drafts of operators for the airport of Ahlhorn:
Within the framework of this conversion project the SÖLLNER CONSULT GmbH
investigated drafts on the subsequent use of the former military airport of Ahlhorn
together with partners and by this it prepared a basis for decision-taking for
selecting the investors. 2006 |
 |
 |
 |
|
|
|
|
 |
 |
Perspectives of the airfields in the Brandenburg state:
Selected airfields of Brandenburg have been investigated according to different criteria
and development perspectives have been presented to continue the air transport programmes
of the Brandenburg state. 2006-2007 |
 |
 |
 |
|
|
|
|
 |
 |
Preparation of noise measurement reports:
The team of SÖLLNER CONSULT GmbH compiles the results of the noise measurement
monitoring of the Frankfurt-Hahn Airport in monthly reports. Furthermore, the company
acts as an expert advisor to the noise protection coordinator of the airport. since 2005 |
 |
 |
 |
|
|
|
|
 |
 |
EDI
Erie • Drewitz International: Within the framework of an international investment
project the airport of Cottbus-Drewitz is developed for international cargo transports.
The SÖLLNER CONSULT GmbH accompanies preliminary and approval planning and
coordinates an application conference on the planned regional planning procedure. 2004-2006 |
 |
 |
 |
|
|
|
|
 |
 |
Investigation of hindrances:
To differentiate the required clearing the SÖLLNER CONSULT GmbH investigated
a clearing plan within the framework of the extension of the take-off and landing runway
of the Frankfurt-Hahn Airport. 2005 |
 |
 |
 |
|
|
|
|
 |
 |
Integrated overall plan – cargo area North: Several offices prepared the extension planning
for the cargo area North of the Frankfurt-Hahn Airport. It was the task
of the SÖLLNER CONSULT GmbH to synchronise the individual planning with the
overall extension plan and to develop an integrated overall plan. 2004-2005 |
 |
 |
 |
|
|
|
|
 |
 |
Project management at the extension of the Frankfurt-Hahn Airport: Coordination and control
of the approval procedure, draft for the application on the procedure on official approval,
development and compilation of the documents, coordination of all parties involved,
quality assurance, accompanying the procedure on official approval, PR. 2002-2007 |
 |
 |
 |
|
|
|
|
 |
 |
Processing of objections for the extension of the Frankfurt-Hahn Airport:
Processing of received comments and objections, derivation of
statements of the facts and their systematic concentration in
certain fields of topic, elaboration of replies. 2004 |
 |
 |
 |
|
|
|
|
 |
 |
Effects of new take-off routes at the Frankfurt-Hahn Airport:
The aircraft noise has always to be controlled in the region of landing and take-off routes.
In this connection the SÖLLNER CONSULT GmbH assessed flight path records
and simulated traffic routings. 2004 |
 |
 |
 |
|
|
|
|
 |
|
Pre-selection of variants for the extension of the Frankfurt Airport:
In cooperation with the project bodies and the project control
the SÖLLNER CONSULT GmbH prepared the explanation of the pre-selection of the variants
for the extension of the airport of Frankfurt Main. 2002-2004
|
 |
 |
 |
|
|
|
|
 |
|
Regional planning procedure on the extension of the Frankfurt-Hahn Airport:
Within the framework of the extension of the take-off and landing runway
of the airport of Frankfurt-Hahn the SÖLLNER CONSULT GmbH undertook coordination
and control of the regional planning procedure. 2002-2003
|  |
 |
 |
|
| |
|
 |
|
Quality assurance:
The SÖLLNER CONSULT GmbH ensured the quality in form and content of the
application documents for the regional planning procedure on the extension
of the Frankfurt Airport. 2001-2002 |
 |
 |
 |
|
|
|
|
 |
|
Regional compatibility study:
The SÖLLNER CONSULT GmbH elaborated this study regarding the extension
of the airport of Frankfurt Main. It is regarded as a central part
of the application documents of the project body (Fraport AG, Frankfurt Airport Services Worldwide)
for the regional planning procedure. 2001 |
 |
 |
 |
|
|
|
|